316 |
Supply of Pulse Jet Dust Collector along with centrifugal Fan at Processed Salt Plant at Sambhar lake |
14.00 hrs 02.06.2012 |
14.30 hrs 02.06.2012 |
N |
315 |
Supply of Front end loader Tractor, trolley, scraper, leveller & plough complete at our Sambhar unit. |
14.00 hrs 02.06.2012 |
14.30 hrs 02.06.2012 |
N |
314 |
Fabrication, supply & installation of Gyro-sieve at Gudha Salt Refinery |
14.00 hrs 02.06.2012 |
14.30 hrs 02.06.2012 |
N |
313 |
Fabrication, supply & installation of Cylindrical type Rotary screening(Sieve) Machine complete, at Processed Salt Plant, Sambhar Lake |
14.00 hrs 01.06.2012 |
14.30 hrs 01.06.2012 |
N |
312 |
Fabrication & supply of SS screw conveyer and horizontal salt feed(Finish Product) Rubber Belt Conveyer Assembly for Processed Salt Plant, at Sambhar lake |
14.00 hrs 01.06.2012 |
14.30 hrs 01.06.2012 |
N |
311 |
Supply & installation of Biometric Attendance Machine(Thumb impression cum Face Reader) at Sambhar Lake unit and Kharaghoda unit |
14.00 hrs 01.06.2012 |
14.30 hrs 01.06.2012 |
N |
310 |
Designing, fabrication, supply & fixing of Pre-stressed Concrete Sleepers for MG & NG Track at Sambhar Lake |
14.00 hrs 01.06.2012 |
14.30 hrs 01.06.2012 |
N |
309 |
Supply & installation of Winding & Re-winding machine for Polyester Roll at Gudha Salt Refinery |
14.00 hrs 01.06.2012 |
14.30 hrs 01.06.2012 |
N |
308 |
Appointment of consultant for exploring possibilities for manufacturing Bye-products of Bromine & Bittern containing Potassium & Magnesium Chloride at Kharaghoda(Gujarat) |
14.00 hrs 31.05.2012 |
14.30 hrs 31.05.2012 |
N |
307 |
Supply of 4” & 6” Dia HDPE pipes/Tank at Kharaghoda unit. |
14.00 hrs 31.05.2012 |
14.30 hrs 31.05.2012 |
N |
306 |
Supply and installation of Titanium Plate heat exchanger for Bromine Plant at Kharaghoda(Gujarat) |
14.00 hrs 31.05.2012 |
14.30 hrs 31.05.2012 |
N |
305 |
Supply of Glass Column 24”Dia x 1500 mm and 1510 mm long with min.12 mm thick with FRP coating |
14.00 hrs 31.05.2012 |
14.30 hrs 31.05.2012 |
N |
304 |
Construction of RCC Slab Culvert for approach Road at Jhapog . |
14.00 hrs 24.05.2012 |
14.30 hrs 24.05.2012 |
N |
303 |
Construction of AC Sheet Shed at P.S.Plant, Sambhar Lake |
14.00 hrs 23.05.2012 |
14.30 hrs 23.05.2012 |
N |
302 |
Construction of watch Towers at Lake Area |
14.00 hrs 23.05.2012 |
14.30 hrs 23.05.2012 |
N |
301 |
Renovation of AC Sheet roofing of P.S.Plant at Sales Circle |
14.00 hrs 22.05.2012 |
14.30 hrs 22.05.2012 |
N |
300 |
Construction of Finished Goods Godown at Gudha Salt Refinery during 2011-12. |
14.00 hrs 22.05.2012 |
14.30 hrs 22.05.2012 |
N |
299 |
Construction of approach Road from Jhapog Kyar to dammer Road at Jhapog |
14.00 hrs 21.05.2012 |
14.30 hrs 21.05.2012 |
N |
298 |
Construction of Mount Pillar Pump House Building at Nawa Lake Area. |
14.00 hrs 21.05.2012 |
14.30 hrs 21.05.2012 |
N |
297 |
Development of Pan No. 2 to 15 & 46 to 60 at Nawa Kyar. |
14.00 hrs 21.05.2012 |
14.30 hrs 21.05.2012 |
N |
296 |
Consignment preparation in 50 Kgs good HDPE bags, loading on to trucks, transportation of salt from Nawa to NTPC, Dadri including unloading/stacking at NTPC’s godown. |
12.00 hrs 11.05.2012 |
12.30 hrs 11.05.2012 |
Y |
295 |
Construction of Laboratory & R&D Building at Plot No. G-229, Sitapura Industrial Area, Jaipur(Rajasthan) |
12.00 hrs 02.05.2012 |
12.15 hrs 02.05.2012 |
N |
294 |
Fabrication & supply of moveable Salt feeder rubber belt conveyor assembly at Gudha Refinery(Raj) |
12.00 hrs 13.04.2012 |
12.30 hrs 13.04.2012 |
N |
293 |
Supply of Polyester Roll Winding & Re-winding Machine at Gudha Refinery(Raj) |
12.00 hrs 13.04.2012 |
12.30 hrs 13.04.2012 |
N |
292 |
Annual rate contract for supply of Polyester Roll/Pouches during 2012-13 at Sambhar lake(Raj) |
12.00 hrs 13.04.2012 |
12.30 hrs 13.04.2012 |
N |
291 |
Annual rate contract for supply of HDPE Bags for packing of salt during 2012-13 at Sambhar Lake(Raj) |
12.00 hrs 13.04.2012 |
12.30 hrs 13.04.2012 |
N |
290 |
Designing, Fabrication/Supply & Fixing of PCC Sleeper in Rail track at Sambhar Lake(Raj) |
12.00 hrs 12.04.2012 |
12.00 hrs 12.04.2012 |
N |
|